Here we are on the morning of the fourth day of the project and progress has been sadly slow. I felt pretty rotten yesterday afternoon and went to bed early. I'm feeling a bit better today, so I hope to get more work in. Although I am also planning to drive over to Wonthaggi (the nearest large town) to shop for some supplies and sundries. For some reason, I can't find bath toys at all where I live. This has nothing to do with the project, it's just been annoying me.
Anyway - photos.
|
The basic shapes and details of the engine section are now complete. I still need to add rivets and a lot of details like pipes and runes and smaller parts. |
|
The big stack is actually the second attempt - the drill wrecked the first attempt so I had to get creative. I drilled the three holes three times with different sized drills and with a second tube nested inside to stop the bits tearing things apart. This worked fairly well, but not perfectly. |
|
I have not really integrated the front edge of the engine into the upper bodywork yet. There are still some gaps which need filling. |
|
And once more, the glorious yoghurt tube topper comes to the fore! The PVC pipe connectors along the top turned out to be an unusual size which I could not find any pipe to match meaning it was a problem to get them nice and solidly joined back to back. Then I found a cardboard receipt paper roll which was exactly the right size... To be honest, a lot of time yesterday was spent scrounging round for the right parts. |
As usual, feel free to speculate on exactly what this is in the comments. I feel it should be becoming clearer, but then I know what it is so I have an advantage...
I still have no idea what it is!
ReplyDelete